Day 112

 

 

Let the framing begin...
Today the plastic was removed to reveal the cap boards, 2x12 floor joists, plywood sub floor, and other bits of processed wood. First the cap boards were installed on top of the foundation with lag bolts used to anchor the wood. At the same time Richard Hinson of Redneck Pest Control was dousing the inside and outside the foundation with the first termite treatment to the old and new building.
There was some tweaking of the old beams to get them closer to level though with an old structure level is always abstract and close enough.
Tomorrow the rest of the joists will be nailed in place and we go on from there...
Stay tuned...